Table Olive Production Line Cost: What Shapes the Budget?

Green olives in a stainless steel washing and transfer channel

Plan olive factory investment around capacity, whole or pitted products, container format, automation and utilities.

Start with a defined product brief

An equipment budget starts with the intended olives and packaging. Define green or black varieties, whole or pitted products, size grades, covering liquid and container sizes. The supplied Liniea brief covers 5–25 tonnes of olives per day. This is a planning range for the complete line, not the guaranteed output of every product configuration. State operating hours, product mix and expected saleable output before requesting comparable quotations.

Compare equivalent equipment duties

Grading, destemming, pitting, washing, olive filling, liquid dosing, closing and thermal processing must work together. A project using glass jars needs suitable cap handling; metal cans and PET containers require their own closing and handling arrangements. The choice between operator-assisted and integrated automatic operation changes both investment and staffing. Compare the complete equipment scope rather than the price of a single filler.

Include the factory beyond the machines

Allow for receiving and processing areas, packaging, storage, quarantine space, piping and utilities. Multistage washing, a pasteurising tunnel, water- and energy-use control and provision for future expansion influence the estimate. Include installation, operational testing, training, spares and working capital. Confirm what is included in each supplier quotation so civil works and utility connections are not left unresolved.

Build a project-specific estimate

Use actual quotations, local labour and utility costs, container prices and a realistic sales plan. Test the budget against lower utilisation, changing olive prices and cleaning or changeover time. A coordinated scope makes these assumptions easier to review. Liniea can define the machinery and installation package around the selected product, capacity and automation; the final investment follows the confirmed engineering scope.

Explore the Liniea table olive production line or discuss your factory requirements.

Leave a Reply

Your email address will not be published. Required fields are marked *