Plan fruit receiving, preparation, cooking, hot packaging, storage and utilities as a coordinated factory flow.
Translate capacity into a workable layout
The supplied Liniea brief gives a production-line space range of 650–1,000 m². This is a planning reference, not a substitute for a site-specific drawing. Fruit type, production capacity, the packaging format, storage requirements and service access determine the final arrangement. Confirm whether quoted areas cover only the line or the complete factory.
Provide the necessary production zones
The main areas are fruit receiving and sorting, preparation, the cooking hall and hot packaging. Empty glass jars or cans need protected storage, while finished products need an orderly holding and dispatch area. A quality-control laboratory supports product checks. Plan routes for ingredients, containers, people, waste and cleaning equipment so they do not unnecessarily cross.
Coordinate utilities before delivery
Infrastructure includes hygienic water at an adequate flow rate, industrial three-phase electricity, steam generation or another stable heat source, compressed air and hygienic wastewater disposal. Obtain connection and consumption requirements from the agreed equipment schedule. The line brief lists electricity, water and gas or diesel; this does not establish the electrical rating of every machine.
Protect access and future capacity
Separate clean and semi-clean areas according to the hygiene plan. Leave access for maintenance, cleaning and safe removal of components. Check doors, unloading areas, drainage and the route used to move machinery into the building. Reserve suitable space and service capacity for planned additional kettles, a faster filler or secondary packaging. Review the layout with the production and quality teams before civil work is finalised.