Planning a Tomato Paste Factory

Compare harvest availability with the hours the plant can operate. Fresh intake and finished paste output are different quantities; an agreed mass balance connects them. Provide representative raw-material information before sizing the evaporation section.

Define the production brief

Begin with fresh tomato intake and seasonal availability. Record target paste concentration and downstream packaging. Give the engineering team a clear first-phase product range and separate it from possible later expansion. A realistic brief identifies operating shifts, planned changeovers and how incoming material will be stored.

Plan the whole factory

The scope should connect raw tomato receiving, juice extraction and concentration. Allow for storage, maintenance access, personnel movement and finished-product dispatch. A floor plan should show service access as well as equipment footprints; clearances and material flow need review before civil work is committed.

Check utilities and project boundaries

Review steam demand, cooling water, electrical supply and cleaning water against the proposed equipment list. Identify who supplies building work, service distribution, installation and commissioning. Separate the equipment price from site preparation, freight and operating inputs when comparing proposals.

Prepare information for a quotation

Share a site drawing, intended production schedule, representative product details and retail cans, glass jars or aseptic bulk bags. Ask for a documented scope and assumptions, then review evaporation capacity and the seasonal receiving window before confirming the line configuration.