Table Olive Factory Space and Infrastructure

Plan receiving, processing, packaging, storage, quarantine and saline-wastewater management as one factory.

Establish the area and operating scope

The supplied Liniea brief gives a production-line space reference of 650–1,000 m². Actual factory requirements depend on capacity, olive residence times and automation. Clarify whether a quoted area includes stores, external receiving and utilities. A suitable site arrangement must accommodate the complete operating programme, not just the floor footprint of the machines.

Provide the required operating zones

Plan unloading and receiving, preparation and processing halls, a packaging hall, empty-container storage, finished-product storage and a quarantine area. Identify routes for incoming olives, empty jars or cans, finished packs, operators, cleaning equipment and waste. Keep access to inspection points and maintenance areas. The layout should support orderly movement between each processing stage and allow batches to be identified.

Confirm utilities and effluent arrangements

The source identifies hygienic and industrial water, three-phase electricity, gas or steam, saline-wastewater drainage and treatment, process piping and associated installations. Obtain the actual connection and consumption schedule for the selected machinery. A general utility list does not determine equipment ratings. Review the local effluent conditions and treatment scope before finalising the site plan.

Reserve practical space for development

Capacity growth can require more pitting heads, an upgraded filler, faster conveyors or another pasteurising tunnel. Leave installation access and suitable utility routes where expansion is planned. Review the drawing with production and maintenance staff before committing to civil work. Liniea can coordinate machinery placement, installation and commissioning around the product brief and the available building.